Solar · Brazil

Areia Branca Hybrid solar farm

Planned (permitted)813 MWChecked 8 October 2026Last changed in the dataset 14 November 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Areia Branca Hybrid solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
813 MW
Status
Planned (permitted) (Pre-construction)
Owner
Maturati Participações SA [100%]
Location
Região Geográfica Intermediária de Mossoró, Rio Grande do Norte, Brazil

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Areia Branca Hybrid solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.