← Back to Anglesey
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Anglesey Penrhos BESS

Operator ANGLESEY LAND HOLDINGS LIMITED

Awaiting Construction210 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Anglesey Penrhos BESS is a 210 MW battery storage site on the edge of Holyhead, Anglesey, United Kingdom. Its status in the public dataset is awaiting construction. There are 2 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites in the United Kingdom, and 197 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Anglesey Penrhos BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 112 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool112 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells233 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire252 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Battery)
Capacity
210 MW
Capacity figure from
Capacity Market register (EMR Delivery Body)
Status
Awaiting Construction (Capacity Market unit, delivery year 2027)
Operator
ANGLESEY LAND HOLDINGS LIMITED
Location
Anglesey, LL65 2TJ, United Kingdom

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Anglesey Penrhos BESS. If you know of one, report it (confidential reports are anonymised).

Has Anglesey Penrhos BESS had a fire or other incident?
None is on the register as of 12 November 2026. The register holds no published incident that names Anglesey Penrhos BESS; it holds 14 incidents at battery storage sites in the United Kingdom.
What is the status of Anglesey Penrhos BESS?
Awaiting Construction, in the public dataset.
Where is Anglesey Penrhos BESS?
On the edge of Holyhead, Anglesey, United Kingdom (postcode LL65 2TJ).

The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).