Onshore wind · United Kingdom
Alwen Forest Project
Operator RWE Generation & Innogy
Awaiting Construction59.4 MWData checked 16 November 2026Source record dated 2 October 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Alwen Forest Project is a 59.4 MW wind farm Gwynedd, United Kingdom. Its planning application (DNS/3214855) went to Welsh Government (NSIP) on 19 September 2024 and was granted on 2 October 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Alwen Forest Project changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Alwen Forest Project sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, newest first. This site has no map point in the dataset, so the pack lists them newest first.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1157 | 2026 | Fire destroys turbine at Whitelee windfarm near Glasgow | not mapped | Significant |
| EIR-0173 | 2026 | Substation fire breaks out at Bradwell-on-Sea Wind Farm in Essex | not mapped | Minor |
| EIR-0874 | 2026 | Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales | not mapped | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 59.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- RWE Generation & Innogy
- Location
- Alwens Forest, Llyn Brenig, Conwy, Gwynedd, LL21, United Kingdom
- Planning authority
- Welsh Government (NSIP)
- Planning application
- DNS/3214855
- Turbines
- 9, 200 m to tip
The planning application page for DNS/3214855, with what the planning evidence pack adds for this site.
Timeline
- 19 September 2024 Planning application submitted
- 2 October 2025 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Alwen Forest Project. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Alwen Forest Project had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Alwen Forest Project; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Alwen Forest Project?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 October 2025.
- Where is Alwen Forest Project?
- Gwynedd, United Kingdom (postcode LL21).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.