Battery storage · United Kingdom
Allington Lane - Solar & Battery Farm
Operator Eastleigh Borough Council
Awaiting Construction16 MWData checked 16 November 2026Source record dated 15 July 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Allington Lane - Solar & Battery Farm is a 16 MW battery storage site in Fair Oak, Hampshire, United Kingdom. Its planning application (F/23/96527) went to Eastleigh on 21 December 2023 and was granted on 26 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 55 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Allington Lane - Solar & Battery Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Allington Lane - Solar & Battery Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 94 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 94 km | Significant |
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 133 km | Significant |
| EIR-0249 | 2026 | Smoke and fire incident at Battery Box, Pinhoe Road, Exeter | 154 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-located with RE)
- Capacity
- 16 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Eastleigh Borough Council
- Location
- We/O Allington Lane, Eastleigh, Hampshire, SO50 7DA, United Kingdom
- Planning authority
- Eastleigh
- Planning application
- F/23/96527
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for F/23/96527, with what the planning evidence pack adds for this site.
Every application in Eastleigh · Alerts for applications and incidents near here
Timeline
- 21 December 2023 Planning application submitted
- 26 July 2024 Planning permission granted
- 26 July 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Allington Lane - Solar & Battery Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Allington Lane - Solar & Battery Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Allington Lane - Solar & Battery Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Allington Lane - Solar & Battery Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 July 2025.
- Where is Allington Lane - Solar & Battery Farm?
- In Fair Oak, Hampshire, United Kingdom (postcode SO50 7DA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).