Solar · France

Agrégation des installations de moins de 36KW

Status not given1.1 MWChecked 19 October 2026

Agrégation des installations de moins de 36KW is a 1.1 MW solar farm on the edge of Parempuyre, France. It first operated in 2008. There are 29 other energy sites within 10 km. The register holds no incident at this site. It holds 5 incidents at solar farms in France, and 390 worldwide.

150 energy sites within 40 km for Agrégation des installations de moins de 36KW

The sites and incidents around this one, and every record behind them, open with any of these.

Analyst, £39 a month

Ask the register any question in plain words and get a sourced answer in seconds (20 a month), plus the full record behind every entry. Cancel at any time. Limited-time price, rising to £79. Join now and keep £39.

Once per person; every record, every page, for reading, and 1 free question to Ask the register; no subscription

Your company pays: an invoice to download and forward, paid by card or bank transfer within 30 days

Technology
Solar
Capacity
1.1 MW
Location
Parempuyre, Gironde, Nouvelle-Aquitaine, France
First operating
2008

View on OpenStreetMap (the dataset gives the commune, so the pin is the commune centre). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

  • 22 October 2008 Connected to the grid
  • 22 October 2008 Operational

None found. The register holds no published incident that names Agrégation des installations de moins de 36KW. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Agrégation des installations de moins de 36KW had a fire or other incident?
None is on the register as of 29 October 2026. The register holds no published incident that names Agrégation des installations de moins de 36KW; it holds 5 incidents at solar farms in France.
Where is Agrégation des installations de moins de 36KW?
On the edge of Parempuyre, France.

Source: Registre national des installations de production et de stockage d'électricité, ODRE (Open Data Réseaux Énergies), Licence Ouverte v2.0 (Etalab). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).