Solar · France
Agrégation des installations de moins de 36KW
Status not given1.5 MWData checked 6 October 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Agrégation des installations de moins de 36KW is a 1.5 MW solar farm in Miramas, France. It first operated in 2008. There are 28 other energy sites within 10 km, 25 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 11 incidents at solar farms (hybrid battery and solar sites included) in France, and 480 worldwide.
Get an email when Agrégation des installations de moins de 36KW changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in France. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1.5 MW
- Capacity figure from
- Registre national des installations (ODRE, France)
- Location
- Miramas, Bouches-du-Rhône, Provence-Alpes-Côte d'Azur, France
- First operating
- 2008
View on OpenStreetMap (the dataset gives the commune, so the pin is the commune centre). The larger dot is this site; the others are sites within 40 km.
Timeline
- 20 November 2008 Connected to the grid
- 20 November 2008 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Agrégation des installations de moins de 36KW. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Agrégation des installations de moins de 36KW had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Agrégation des installations de moins de 36KW; it holds 11 incidents at solar farms (hybrid battery and solar sites included) in France.
- Where is Agrégation des installations de moins de 36KW?
- In Miramas, France.
Source: Registre national des installations de production et de stockage d'électricité, ODRE (Open Data Réseaux Énergies), Licence Ouverte v2.0 (Etalab). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).