← Back to Norfolk

Energy sites / United Kingdom / Norfolk

Battery storage · United Kingdom

ABB & UK Power Networks Energy Storage Installation

Decommissioned0.2 MWChecked 6 October 2026Last changed in the dataset 23 October 2018

Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Status
Decommissioned
Operator or applicant
ABB
Location
Hemsby, Nolfolk, Norfolk, NR29 4NH, United Kingdom
Planning authority
Great Yarmouth
First operating
2011

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 1 November 2010 Construction started
  • 19 May 2011 Operational

None found. The register holds no published incident that names ABB & UK Power Networks Energy Storage Installation. If you know of one, report it (confidential reports are anonymised).

The register holds 14 incidents at battery storage sites in the United Kingdom, 9 of them fires, and 177 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.