A grass fire broke out at a Florida Power and Light solar facility on Linger Longer Road near Beer Creek in northern Bay County. The fire started in grass beneath the panels at about 6:30 on Tuesday evening. Bay County and State Forestry firefighters...
Florida Power and Light
Named in a role in 5 records, between 2021 and 2026.
Being named is not a finding of fault. Counts are of records in published reporting, not rates, and the company's role is the one the sources give.
Work at Florida Power and Light? See every record that names it, free, and ask for a correction or add your side.
Records naming this company
Free entries that mention Florida Power and Light
Escambia County Fire Rescue responded to a brush and grass fire on a Saturday afternoon at Florida Power and Light's First City Solar Energy Center on Cox Road in McDavid. The fire reportedly reached about 20 acres before it was extinguished. The cause was...
A fire broke out at Florida Power and Light's Indian Creek Substation in Miami Beach at around 10:30pm on Saturday 20 March 2021. Miami Beach Fire Rescue crews responded to the blaze in the area of 54th Street and Collins Avenue. FPL shut off power along...
See what failed, why, and what it cost
The record behind each entry: the manufacturer, integrator and operator, root cause, failure mode, downtime, losses and every source.
Volusia County Fire responded to a grass fire reported at a Florida Power and Light solar farm on S.R. 44 in Volusia County, Florida, shortly before 11 a.m. The report describes the day as a Monday morning, but the article is dated 2 January 2019, which was a...
What this page is, and what it is not
It counts the records in this register that name this company in any role. Being named is not a finding of fault. Most incidents have several contributing causes, and the company named as manufacturer, integrator, operator or contractor is often not the cause of what went wrong.
Counts reflect what public reporting names, so a company with a large installed base, or one operating where reporting is open, will appear more often than a company of the same size elsewhere. Read the counts alongside the note on coverage in the methodology.
If you work for this company and something here is wrong, tell us and we will correct it. Use the corrections page: we acknowledge within 2 working days and decide within 10.