← Back to Hartlepool
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Worcestershire CL

Operator WORCESTERSHIRE SOLAR 1 LIMITED · Owner Field Hartmoor LTD

Awaiting Construction33 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Worcestershire CL is a 33 MW battery storage site 4.6 km north-west of Hartlepool, United Kingdom. Its status in the public dataset is awaiting construction. There are 53 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Worcestershire CL sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 177 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells177 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool181 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire335 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Battery)
Capacity
33 MW
Capacity figure from
Capacity Market register (EMR Delivery Body)
Status
Awaiting Construction (Capacity Market unit, delivery year 2027, agreement awarded)
Operator
WORCESTERSHIRE SOLAR 1 LIMITED
Owner
Field Hartmoor LTD
Location
Hartlepool, TS27 3BL, United Kingdom

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Worcestershire CL. If you know of one, report it (confidential reports are anonymised).

Has Worcestershire CL had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Worcestershire CL; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Worcestershire CL?
Awaiting Construction, in the public dataset.
Where is Worcestershire CL?
4.6 km north-west of Hartlepool, United Kingdom (postcode TS27 3BL).

The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).