← Back to Suffolk
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Wissett Solar Farm, Wissett - Battery Storage (Apple Tree)

Operator Pathfinder Clean Energy UK Dev Limited

Awaiting Construction10 MWData checked 16 November 2026Source record dated 23 February 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Wissett Solar Farm, Wissett - Battery Storage (Apple Tree) is a 10 MW battery storage site in Halesworth, Suffolk, United Kingdom. Its planning application (DC/22/3313/FUL) went to East Suffolk on 28 September 2022 and was granted on 17 February 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 18 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wissett Solar Farm, Wissett - Battery Storage (Apple Tree) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 121 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction121 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells195 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire244 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Pathfinder Clean Energy UK Dev Limited
Location
UKZ139 BC Wissett Solar Farm, Grays Lane, Wissett, Suffolk, IP19 0RA, United Kingdom
Planning authority
East Suffolk
Planning application
DC/22/3313/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/22/3313/FUL, with what the planning evidence pack adds for this site.

Every application in East Suffolk · Alerts for applications and incidents near here

  • 28 September 2022 Planning application submitted
  • 17 February 2025 Planning permission granted
  • 17 February 2028 Planning permission runs out

None found. The register holds no published incident that names Wissett Solar Farm, Wissett - Battery Storage (Apple Tree). If you know of one, report it (confidential reports are anonymised).

Has Wissett Solar Farm, Wissett - Battery Storage (Apple Tree) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wissett Solar Farm, Wissett - Battery Storage (Apple Tree); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wissett Solar Farm, Wissett - Battery Storage (Apple Tree)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 February 2026.
Where is Wissett Solar Farm, Wissett - Battery Storage (Apple Tree)?
In Halesworth, Suffolk, United Kingdom (postcode IP19 0RA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).