Battery storage · United Kingdom
Wentlooge Renewable Energy Hub
Operator Wentlooge Farmers' Solar Scheme
Appeal LodgedData checked 16 November 2026Source record dated 13 February 2024
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Wentlooge Renewable Energy Hub is a battery storage site 7 km south-west of Newport, Gwent, United Kingdom. Its planning application (CAS-01772-Z5P5D2) went to Welsh Government (NSIP) on 20 June 2022. Its status in the Renewable Energy Planning Database (UK government) is appeal lodged. There are 68 other energy sites within 10 km, 31 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Wentlooge Renewable Energy Hub changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
WENTLOOGE FARMERS' SOLAR SCHEME LIMITED (08636572), active, since 2013. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wentlooge Renewable Energy Hub sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 80 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 80 km | Significant |
| EIR-0249 | 2026 | Smoke and fire incident at Battery Box, Pinhoe Road, Exeter | 93 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 207 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-located with RE)
- Status
- Appeal Lodged
- Operator or applicant
- Wentlooge Farmers' Solar Scheme
- Location
- Land SW of St Brides on the Gwent Levels, Gwent, United Kingdom
- Planning authority
- Welsh Government (NSIP)
- Planning application
- CAS-01772-Z5P5D2
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for CAS-01772-Z5P5D2, with what the planning evidence pack adds for this site.
Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here
Timeline
- 20 June 2022 Planning application submitted
- 8 February 2024 Appeal lodged
Incidents on the register at this site
None found. The register holds no published incident that names Wentlooge Renewable Energy Hub. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Wentlooge Renewable Energy Hub had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Wentlooge Renewable Energy Hub; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Wentlooge Renewable Energy Hub?
- Appeal Lodged, in the Renewable Energy Planning Database (UK government), where it last changed on 13 February 2024.
- Where is Wentlooge Renewable Energy Hub?
- 7 km south-west of Newport, Gwent, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).