Around this site

← Back to Egypt

Solar · Egypt

Voltalia-TAQA Project solar farm

Under construction2100 MWChecked 8 October 2026Last changed in the dataset 7 February 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Voltalia-TAQA Project solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
2100 MW
Status
Under construction (Construction)
Owner
Voltalia SA; Taqa Power
Location
Ain Sokhna, Egypt
First operating
2028

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Voltalia-TAQA Project solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.