← Back to Sicily
Planning pack for this site, £295Other options

Solar · Italy

Torre di Mastro solar farm

Operator HF Solar 1 · Owner EOS Investment Management Group [100%]

Planned (permitted)61.4 MWData checked 8 October 2026Source record dated 12 February 2025

Watch this siteIts incidents, owner and operator, in your workspace and by email. 7 days free, no card.

Torre di Mastro solar farm is a 61.4 MW solar farm 5.4 km north-west of Campobello di Licata, Agrigento, Sicily, Italy. Its status in the Global Energy Monitor solar and wind trackers is planned (permitted). There is one other energy site within 10 km. The register holds no incident at this site. It holds 24 incidents at solar farms (hybrid battery and solar sites included) in Italy, and 490 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Torre di Mastro solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 24 comparable solar incidents in Italy, nearest first. The nearest is EIR-2935, Copper thieves cut cables from solar plant cabins in Aragona, Sicily, 26 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-29352026Copper thieves cut cables from solar plant cabins in Aragona, Sicily26 kmMinor
EIR-26892022Rooftop solar panels catch fire on Caltagirone toy warehouse56 kmSignificant
EIR-26872022Fire breaks out in electrical cabin of PV system at Cus Catania108 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
61.4 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Planned (permitted) (Pre-construction)
Operator
HF Solar 1
Owner
EOS Investment Management Group [100%]
Location
Agrigento, Sicily, Italy

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Torre di Mastro solar farm. If you know of one, report it (confidential reports are anonymised).

Has Torre di Mastro solar farm had a fire or other incident?
None is on the register as of 26 November 2026. The register holds no published incident that names Torre di Mastro solar farm; it holds 24 incidents at solar farms (hybrid battery and solar sites included) in Italy.
What is the status of Torre di Mastro solar farm?
Planned (permitted), in the Global Energy Monitor solar and wind trackers, where it last changed on 12 February 2025.
Where is Torre di Mastro solar farm?
5.4 km north-west of Campobello di Licata, Agrigento, Sicily, Italy.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).