Battery storage · United Kingdom

Orrell (Tontine Road - Battery Energy Storage System)

Operator Coriolis Energy · Owner Coriolis Energy Storage Limited

Application Submitted70 MWData checked 16 November 2026Source record dated 19 October 2021

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Orrell (Tontine Road - Battery Energy Storage System) is a 70 MW battery storage site 3.8 km south-east of Skelmersdale, Greater Manchester, United Kingdom. Its planning application (2022/1368/FUL) went to West Lancashire on 31 January 2023. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 54 other energy sites within 10 km, 27 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

CORIOLIS ENERGY LIMITED (10189460), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Orrell (Tontine Road - Battery Energy Storage System) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 21 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool21 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells116 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire209 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
70 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Coriolis Energy
Owner
Coriolis Energy Storage Limited
Location
S/O Ashton Hall, Tontine Road, Road Up Holland, Wigan, Greater Manchester, WN8 0NF., United Kingdom
Planning authority
West Lancashire
Planning application
2022/1368/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2022/1368/FUL, with what the planning evidence pack adds for this site.

Every application in West Lancashire · Alerts for applications and incidents near here

  • 31 January 2023 Planning application submitted

None found. The register holds no published incident that names Orrell (Tontine Road - Battery Energy Storage System). If you know of one, report it (confidential reports are anonymised).

Has Orrell (Tontine Road - Battery Energy Storage System) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Orrell (Tontine Road - Battery Energy Storage System); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Orrell (Tontine Road - Battery Energy Storage System)?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 19 October 2021.
Where is Orrell (Tontine Road - Battery Energy Storage System)?
3.8 km south-east of Skelmersdale, Greater Manchester, United Kingdom (postcode WN8 0NF.).