Planning pack for this site, £295Other options

Battery storage · United Kingdom

Tollgate Battery Storage Facility

Operator RNA Energy · Owner Rnk Holding LTD

Revised49.5 MWData checked 16 November 2026Source record dated 23 November 2018

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Tollgate Battery Storage Facility is a 49.5 MW battery storage site 3.3 km south of Hatfield, Hertfordshire, United Kingdom. Its planning application (6/2017/0702/MAJ) went to Welwyn Hatfield on 6 April 2017 and was refused on 6 July 2017. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 50 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

RNK HOLDING LTD (16104726), active, since 2024. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tollgate Battery Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 53 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction53 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire117 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells165 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
RNA Energy
Owner
Rnk Holding LTD
Location
Tollgate Farm, Tollgate Road, North Mymms, Hertfordshire, AL4 0NY, United Kingdom
Planning authority
Welwyn Hatfield
Planning application
6/2017/0702/MAJ

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 6/2017/0702/MAJ, with what the planning evidence pack adds for this site.

Every application in Welwyn Hatfield · Alerts for applications and incidents near here

  • 6 April 2017 Planning application submitted
  • 6 July 2017 Planning permission refused

None found. The register holds no published incident that names Tollgate Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Tollgate Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tollgate Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tollgate Battery Storage Facility?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 23 November 2018.
Where is Tollgate Battery Storage Facility?
3.3 km south of Hatfield, Hertfordshire, United Kingdom (postcode AL4 0NY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).