Offshore wind · South Korea

Taean wind farm

Planned (permitted)504 MWChecked 8 October 2026Last changed in the dataset 2 July 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Taean wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Offshore wind
Capacity
504 MW
Status
Planned (permitted) (Pre-construction)
Owner
Copenhagen Infrastructure Partners P/S [49%]; Vena Energy [51%]
Location
Taean-gun, South Chungcheong Province, South Korea
First operating
2029

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Taean wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.