Battery storage · United Kingdom

Suncoast Battery Storage

Operator Low Carbon Solar Park 20 Limited

Awaiting Construction5 MWData checked 16 November 2026Source record dated 27 February 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Suncoast Battery Storage is a 5 MW battery storage site on the edge of Eastbourne, East Sussex, United Kingdom. Its planning application (230800) went to Eastbourne on 29 November 2023 and was granted on 19 February 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 19 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Suncoast Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 78 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction78 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire185 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter265 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Low Carbon Solar Park 20 Limited
Location
Land Adjacent Eastbourne Golf Club Lottbridge Drove Eastbourne, East Sussex, BN23 6QJ, United Kingdom
Planning authority
Eastbourne
Planning application
230800

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 230800, with what the planning evidence pack adds for this site.

Every application in Eastbourne · Alerts for applications and incidents near here

  • 29 November 2023 Planning application submitted
  • 19 February 2025 Planning permission granted
  • 19 February 2028 Planning permission runs out

None found. The register holds no published incident that names Suncoast Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Suncoast Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Suncoast Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Suncoast Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 February 2026.
Where is Suncoast Battery Storage?
On the edge of Eastbourne, East Sussex, United Kingdom (postcode BN23 6QJ).