Solar · Saudi Arabia
Sudair Solar PV Project
Operational1500 MWChecked 8 October 2026Last changed in the dataset 12 July 2024
The site
- Technology
- Solar
- Capacity
- 1500 MW
- Status
- Operational (Operating)
- Operator
- Saudi Aramco Power; ACWA Power; Water and Electricity Holding CO (Badeel)
- Owner
- Saudi Aramco Power Co [30%]; Water and Electricity Holding CO (Badeel) [35%]; ACWA Power Co [35%]
- Location
- Sudair Industrial City, Riyadh, Saudi Arabia
- First operating
- 2023
- Phases in the tracker
- 2
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Sudair Solar PV Project. If you know of one, report it (confidential reports are anonymised).
Follow Sudair Solar PV Project
Get one email when this site's status changes in the Global Energy Monitor solar and wind trackers, or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.