Planning pack for this site, £295Other options

Battery storage · United Kingdom

Stocking Lane - Battery Energy Facility

Operator Nel Tiger

Application Submitted200 MWData checked 16 November 2026Source record dated 23 October 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Stocking Lane - Battery Energy Facility is a 200 MW battery storage site 3.2 km east of Knottingley, West Yorkshire, United Kingdom. Its planning application (ZG2023/0938/FULM) went to North Yorkshire on 16 September 2023. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 62 other energy sites within 10 km, 26 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Stocking Lane - Battery Energy Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 66 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells66 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool118 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire227 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
200 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Nel Tiger
Location
Stocking Lane, Weeland Road, Knottingley, West Yorkshire, WF11 8DL, United Kingdom
Planning authority
North Yorkshire
Planning application
ZG2023/0938/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ZG2023/0938/FULM, with what the planning evidence pack adds for this site.

Every application in North Yorkshire · Alerts for applications and incidents near here

  • 16 September 2023 Planning application submitted

None found. The register holds no published incident that names Stocking Lane - Battery Energy Facility. If you know of one, report it (confidential reports are anonymised).

Has Stocking Lane - Battery Energy Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stocking Lane - Battery Energy Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Stocking Lane - Battery Energy Facility?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 23 October 2023.
Where is Stocking Lane - Battery Energy Facility?
3.2 km east of Knottingley, West Yorkshire, United Kingdom (postcode WF11 8DL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).