Battery storage · United Kingdom
Braintree Electric Forecourt (Slamseys Energy Storage)
Operator Gridserve Energy Storage · Owner Braintree Electric Forecourt Ltd
Under Construction10 MWData checked 16 November 2026Source record dated 20 January 2020
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Braintree Electric Forecourt (Slamseys Energy Storage) is a 10 MW battery storage site 3.7 km south-west of Braintree, Essex, United Kingdom. Its planning application (17/01235/FUL) went to Braintree on 6 July 2017 and was granted on 15 September 2017. Construction started on 13 January 2020. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 39 other energy sites within 10 km, 15 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Braintree Electric Forecourt (Slamseys Energy Storage) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
BRAINTREE ELECTRIC FORECOURT LTD (10268643), active, since 2016. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Braintree Electric Forecourt (Slamseys Energy Storage) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 42 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 42 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 169 km | Significant |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 180 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 10 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Gridserve Energy Storage
- Owner
- Braintree Electric Forecourt Ltd
- Location
- Land North Of Slamseys Farm, Blackley Lane, Great Notley, Essex, Essex, CM77 7QW, United Kingdom
- Planning authority
- Braintree
- Planning application
- 17/01235/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 17/01235/FUL, with what the planning evidence pack adds for this site.
Every application in Braintree · Alerts for applications and incidents near here
Timeline
- 6 July 2017 Planning application submitted
- 15 September 2017 Planning permission granted
- 13 January 2020 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Braintree Electric Forecourt (Slamseys Energy Storage). If you know of one, report it (confidential reports are anonymised).
Questions
- Has Braintree Electric Forecourt (Slamseys Energy Storage) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Braintree Electric Forecourt (Slamseys Energy Storage); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Braintree Electric Forecourt (Slamseys Energy Storage)?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 January 2020.
- Where is Braintree Electric Forecourt (Slamseys Energy Storage)?
- 3.7 km south-west of Braintree, Essex, United Kingdom (postcode CM77 7QW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).