Around this site

← Back to Riyadh

Onshore wind · Saudi Arabia

Shaqra wind farm

Planned (permitted)1000 MWChecked 8 October 2026Last changed in the dataset 25 November 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Shaqra wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
1000 MW
Status
Planned (permitted) (Pre-construction)
Operator
Water and Electricity Holding CO (Badeel); Saudi Aramco Power; ACWA Power
Owner
Saudi Aramco Power Co [30%]; Water and Electricity Holding CO (Badeel) [34%]; ACWA Power Co [35%]
Location
Shaqra, Riyadh, Saudi Arabia
First operating
2028

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Shaqra wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.