Around this site

← Back to Asir

Solar · Saudi Arabia

Bisha solar farm

Planned (permitted)3000 MWChecked 8 October 2026Last changed in the dataset 24 November 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bisha solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
3000 MW
Status
Planned (permitted) (Pre-construction)
Operator
Water and Electricity Holding CO (Badeel); Saudi Aramco Power; ACWA Power
Owner
Saudi Aramco Power Co [30%]; Water and Electricity Holding CO (Badeel) [34%]; ACWA Power Co [35%]
Location
Bisha, Bisha, Asir, Saudi Arabia

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Bisha solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.