← Back to Devon
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Saundercroft Farm - Battery Energy Storage System

Operator Exeter Storage Limited (Statera Energy)

Awaiting Construction290 MWData checked 16 November 2026Source record dated 2 February 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Saundercroft Farm - Battery Energy Storage System is a 290 MW battery storage site 10 km north-east of Exeter, Devon, United Kingdom. Its planning application (23/0962/MFUL) went to East Devon on 18 May 2023 and was granted on 12 January 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 57 other energy sites within 10 km, 20 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Saundercroft Farm - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 6.2 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter6.2 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire147 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction278 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
290 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Exeter Storage Limited (Statera Energy)
Location
Saundercroft Farm, Whimple, Exeter, Devon, EX5 2PF, United Kingdom
Planning authority
East Devon
Planning application
23/0962/MFUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/0962/MFUL, with what the planning evidence pack adds for this site.

Every application in East Devon · Alerts for applications and incidents near here

  • 18 May 2023 Planning application submitted
  • 12 January 2024 Planning permission granted
  • 21 January 2029 Planning permission runs out

None found. The register holds no published incident that names Saundercroft Farm - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Saundercroft Farm - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Saundercroft Farm - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Saundercroft Farm - Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 February 2024.
Where is Saundercroft Farm - Battery Energy Storage System?
10 km north-east of Exeter, Devon, United Kingdom (postcode EX5 2PF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).