Battery storage · United Kingdom
Roxane UK, Armathwaite - Solar Array & Battery Storage
Operator Roxane UK Limited
Awaiting Construction1 MWData checked 16 November 2026Source record dated 19 May 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Roxane UK, Armathwaite - Solar Array & Battery Storage is a 1 MW battery storage site 12 km north of Penrith, Cumbria, United Kingdom. Its planning application (2025/1585/FPA) went to Westmorland and Furness on 19 August 2025 and was granted on 17 March 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 11 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Roxane UK, Armathwaite - Solar Array & Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Roxane UK, Armathwaite - Solar Array & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 153 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 153 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 213 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 344 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Roxane UK Limited
- Location
- North of Roxane UK Ltd Armathwaite, Cumbria, CA4 9TU, United Kingdom
- Planning authority
- Westmorland and Furness
- Planning application
- 2025/1585/FPA
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2025/1585/FPA, with what the planning evidence pack adds for this site.
Every application in Westmorland and Furness · Alerts for applications and incidents near here
Timeline
- 19 August 2025 Planning application submitted
- 17 March 2026 Planning permission granted
- 17 March 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Roxane UK, Armathwaite - Solar Array & Battery Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Roxane UK, Armathwaite - Solar Array & Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Roxane UK, Armathwaite - Solar Array & Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Roxane UK, Armathwaite - Solar Array & Battery Storage?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 May 2026.
- Where is Roxane UK, Armathwaite - Solar Array & Battery Storage?
- 12 km north of Penrith, Cumbria, United Kingdom (postcode CA4 9TU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).