Around this site

← Back to Guanacaste

Onshore wind · Costa Rica

Rio Naranjo wind farm

Operational9 MWChecked 8 October 2026Last changed in the dataset 3 August 2022

Technology
Onshore wind
Capacity
9 MW
Status
Operational (Operating)
Operator
Coopeguanacaste RL
Owner
Coopeguanacaste RL [100%]
Location
Cantón Bagaces, Guanacaste, Costa Rica
First operating
2019

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Rio Naranjo wind farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.