Around this site

← Back to Saudi Arabia

Solar · Saudi Arabia

Red Sea Solar Plant

Operational400 MWChecked 8 October 2026Last changed in the dataset 6 January 2025

Technology
Solar
Capacity
400 MW
Status
Operational (Operating)
Operator
Saudi Tabreed District Cooling; SPIC Huanghe Hydropower Development; ACWA Power
Owner
Saudi Tabreed District Cooling Co; ACWA Power Co [50%]; SPIC Huanghe Hydropower Development Co Ltd
Location
Red Sea Coast, Saudi Arabia
First operating
2024

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Red Sea Solar Plant. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.