Around this site

← Back to Cesar

Solar · Colombia

Pétalo Del Cesar Iv La Loma solar project

Planned (permitted)9.9 MWChecked 8 October 2026Last changed in the dataset 19 August 2024

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pétalo Del Cesar Iv La Loma solar project sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
9.9 MW
Status
Planned (permitted) (Pre-construction)
Operator
Black Orchid Solar Sas
Location
El Paso, Cesar, Colombia
First operating
2026

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Pétalo Del Cesar Iv La Loma solar project. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.