Solar · United States
Pawnee Solar & BESS
Under construction250 MWChecked 26 October 2026
Pawnee Solar & BESS is a 250 MW solar farm 15 km south-east of Fort Morgan, Morgan County, Colorado, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 2 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 154 incidents at solar farms in the United States, and 390 worldwide.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pawnee Solar & BESS sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, launch price £145 See a sample pack (PDF)
Get an email when Pawnee Solar & BESS changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preview of the planning evidence pack for this site
The pack for this site lists 52 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-1652, Small fire contained at Terra-Gen battery storage in Valley Center, 605 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1652 | 2026 | Small fire contained at Terra-Gen battery storage in Valley Center | 605 km | Minor |
| EIR-0679 | 2012 | Battery storage failure reported at solar integration site in Flagstaff, Arizona | 887 km | Significant |
| EIR-0025 | 2022 | Battery storage fire at Dorman facility in Chandler, Arizona, managed with robotic entry | 1047 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 49 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 250 MW
- Status
- Under construction
- Operator
- Public Service Co of Colorado
- Location
- Morgan County, Colorado, United States
- Expected
- 2027
- Balancing authority
- PSCO
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Pawnee Solar & BESS. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Pawnee Solar & BESS had a fire or other incident?
- None is on the register as of 29 October 2026. The register holds no published incident that names Pawnee Solar & BESS; it holds 154 incidents at solar farms in the United States.
- What is the status of Pawnee Solar & BESS?
- Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Pawnee Solar & BESS?
- 15 km south-east of Fort Morgan, Morgan County, Colorado, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).