Around this site

← Back to Antofagasta

Onshore wind · Chile

Pampas Hybrid wind farm

Planned (permitted)140 MWChecked 8 October 2026Last changed in the dataset 30 January 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pampas Hybrid wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
140 MW
Status
Planned (permitted) (Pre-construction)
Operator
AES
Owner
AES Corp [100%]
Location
Oficina Salinitas, Taltal, Antofagasta, Chile
First operating
2027

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Pampas Hybrid wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.