← Back to Texas
Planning pack for this site, £295Other options

Battery storage · United States

Padua 3

Operator Padua 3

Under construction200 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Padua 3 is a 200 MW battery storage site 20 km south-east of San Antonio, Bexar County, Texas, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 10 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Padua 3 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 55 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-1227, Firefighters respond to a battery storage fire in Mission, Texas, 346 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12272026Firefighters respond to a battery storage fire in Mission, Texas346 kmSignificant
EIR-16522026Small fire contained at Terra-Gen battery storage in Valley Center950 kmMinor
EIR-28292022Lithium battery fire smoulders at Chandler storage facility, Arizona1357 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 52 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage
Capacity
200 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction
Operator
Padua 3
Owner
Padua 3
Location
Bexar County, Texas, United States
Expected
2026
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Padua 3. If you know of one, report it (confidential reports are anonymised).

Has Padua 3 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Padua 3; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Padua 3?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Padua 3?
20 km south-east of San Antonio, Bexar County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).