Around this site

← Back to Western Cape

Onshore wind · South Africa

Oya Energy Hybrid Facility wind farm

Under construction82.5 MWChecked 8 October 2026Last changed in the dataset 13 January 2026

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Oya Energy Hybrid Facility wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
82.5 MW
Status
Under construction (Construction)
Operator
Oya Energy
Owner
Meadows Energy [22%]; Perpetua Investment Holdings [22%]; G7 Renewable Energies Pty Ltd [20%]; ENGIE SA [35%]
Location
Witzenberg Local Municipality, Cape Winelands District Municipality, Western Cape, South Africa

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Oya Energy Hybrid Facility wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.