Olives Farm, Hooe - Battery Energy Storage Facility

Operator Balanced Grid Solutions Limited · Owner Ninfield Energy Reserve Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 6 June 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Olives Farm, Hooe - Battery Energy Storage Facility is a battery storage site 6.5 km west of Bexhill-on-Sea, East Sussex, United Kingdom. Its planning application (WD/2022/3191/MAJ) went to Wealden on 7 December 2022 and was granted on 21 May 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Olives Farm, Hooe - Battery Energy Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 69 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction69 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire186 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells271 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Balanced Grid Solutions Limited
Owner
Ninfield Energy Reserve Limited
Location
Olives Farm, Hooe, Ninfield, East Sussex, TN33 9HD, United Kingdom
Planning authority
Wealden
Planning application
WD/2022/3191/MAJ

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WD/2022/3191/MAJ, with what the planning evidence pack adds for this site.

Every application in Wealden · Alerts for applications and incidents near here

  • 7 December 2022 Planning application submitted
  • 21 May 2024 Planning permission granted
  • 21 May 2027 Planning permission runs out

None found. The register holds no published incident that names Olives Farm, Hooe - Battery Energy Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Olives Farm, Hooe - Battery Energy Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Olives Farm, Hooe - Battery Energy Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Olives Farm, Hooe - Battery Energy Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 June 2024.
Where is Olives Farm, Hooe - Battery Energy Storage Facility?
6.5 km west of Bexhill-on-Sea, East Sussex, United Kingdom (postcode TN33 9HD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).