Around this site

← Back to Red Sea Cost

Onshore wind · Saudi Arabia

NEOM Green Hydrogen wind farm

Under construction1670 MWChecked 8 October 2026Last changed in the dataset 24 November 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for NEOM Green Hydrogen wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
1670 MW
Status
Under construction (Construction)
Operator
ACWA Power
Owner
NEOM Green Hydrogen Co [33%]; Air Products LLC [33%]; ACWA Power Co [33%]
Location
Neom, Sharma, Red Sea Cost, Saudi Arabia
First operating
2027

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names NEOM Green Hydrogen wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.