Around this site

← Back to Red Sea Cost

Solar · Saudi Arabia

NEOM Green Hydrogen solar farm

Under construction2200 MWChecked 8 October 2026Last changed in the dataset 27 February 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for NEOM Green Hydrogen solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
2200 MW
Status
Under construction (Construction)
Operator
ACWA Power
Owner
NEOM Green Hydrogen Co [33%]; ACWA Power Co [33%]; Air Products and Chemicals Inc [33%]
Location
Neom, Sharma, Red Sea Cost, Saudi Arabia
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names NEOM Green Hydrogen solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.