Battery storage · United Kingdom

Mount Pleasant Farm, Green Lane - Battery Storage

Operator Barton Battery Storage · Owner S4 UK Barton LTD

Under Construction45 MWData checked 16 November 2026Source record dated 19 May 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Mount Pleasant Farm, Green Lane - Battery Storage is a 45 MW battery storage site 6.3 km south-east of Garstang, Lancashire, United Kingdom. Its planning application (06/2022/0763) went to Wyre on 22 December 2022 and was granted on 3 October 2023. Construction started on 1 October 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 18 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mount Pleasant Farm, Green Lane - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 53 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool53 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells134 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire244 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
45 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Barton Battery Storage
Owner
S4 UK Barton LTD
Location
Adjacent Mount Pleasant Farm, Green Lane, Barton, Lancashire, PR3 0RP, United Kingdom
Planning authority
Wyre
Planning application
06/2022/0763

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 06/2022/0763, with what the planning evidence pack adds for this site.

Every application in Wyre · Alerts for applications and incidents near here

  • 22 December 2022 Planning application submitted
  • 3 October 2023 Planning permission granted
  • 1 October 2025 Construction started

None found. The register holds no published incident that names Mount Pleasant Farm, Green Lane - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Mount Pleasant Farm, Green Lane - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mount Pleasant Farm, Green Lane - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Mount Pleasant Farm, Green Lane - Battery Storage?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 May 2026.
Where is Mount Pleasant Farm, Green Lane - Battery Storage?
6.3 km south-east of Garstang, Lancashire, United Kingdom (postcode PR3 0RP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).