MRBESS (Midland Road - Battery Energy Storage)
Owner Peony Ventures Limited
Awaiting Construction80 MWData checked 16 November 2026Source record dated 16 September 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
MRBESS (Midland Road - Battery Energy Storage) is a 80 MW battery storage site in Bradford, West Yorkshire, United Kingdom. Its planning application (23/03888/FUL) went to Bradford on 23 October 2023 and was granted on 20 December 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 60 other energy sites within 10 km, 17 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when MRBESS (Midland Road - Battery Energy Storage) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for MRBESS (Midland Road - Battery Energy Storage) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 87 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 87 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 89 km | Major |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 233 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 80 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Owner
- Peony Ventures Limited
- Location
- Midland Road, Bradford, West Yorkshire, BD8 7DY, United Kingdom
- Planning authority
- Bradford
- Planning application
- 23/03888/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/03888/FUL, with what the planning evidence pack adds for this site.
Every application in Bradford · Alerts for applications and incidents near here
Timeline
- 20 December 2013 Planning permission expired
- 23 October 2023 Planning application submitted
- 20 December 2024 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names MRBESS (Midland Road - Battery Energy Storage). If you know of one, report it (confidential reports are anonymised).
Questions
- Has MRBESS (Midland Road - Battery Energy Storage) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names MRBESS (Midland Road - Battery Energy Storage); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of MRBESS (Midland Road - Battery Energy Storage)?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 September 2025.
- Where is MRBESS (Midland Road - Battery Energy Storage)?
- In Bradford, West Yorkshire, United Kingdom (postcode BD8 7DY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).