Around this site

← Back to Antioquia

Solar · Colombia

Manglares Solar Park

Planned (permitted)99.9 MWChecked 8 October 2026Last changed in the dataset 4 March 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Manglares Solar Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
99.9 MW
Status
Planned (permitted) (Pre-construction)
Operator
TW Solar
Owner
TW Solar SAS [100%]
Location
Turbo, Turbo, Antioquia, Colombia

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Manglares Solar Park. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.