Solar · Greece
Mandrotopos Adriani Solar
Planned (permitted)60 MWChecked 8 October 2026Last changed in the dataset 25 August 2025
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Mandrotopos Adriani Solar sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
The site
- Technology
- Solar
- Capacity
- 60 MW
- Status
- Planned (permitted) (Pre-construction)
- Owner
- Akuo Energy SAS [100%]
- Location
- Drama Regional Unit, Macedonia and Thrace, Greece
- Phases in the tracker
- 3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Mandrotopos Adriani Solar. If you know of one, report it (confidential reports are anonymised).
Follow Mandrotopos Adriani Solar
Get one email when this site's status changes in the Global Energy Monitor solar and wind trackers, or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.