Around this site

← Back to Cauca

Solar · Colombia

Las Marías solar farm

Under construction99.5 MWChecked 8 October 2026Last changed in the dataset 13 January 2026

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Las Marías solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
99.5 MW
Status
Under construction (Construction)
Operator
Solar Las Marías
Owner
Solar Las Marías SASESP [100%]
Location
Bolivar, Sur del Cauca, Cauca, Colombia
First operating
2027

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Las Marías solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.