Battery storage · United Kingdom
Langage Solar Park
Operator Carlton Power
Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 8 April 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Langage Solar Park is a 0.5 MW battery storage site 3.8 km east of Plympton, Devon, United Kingdom. Its planning application (1185/19/FUL) went to South Hams on 6 June 2019 and was granted on 4 October 2019. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 56 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Langage Solar Park changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Langage Solar Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 54 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0249 | 2026 | Smoke and fire incident at Battery Box, Pinhoe Road, Exeter | 54 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 207 km | Significant |
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 333 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-located with RE)
- Capacity
- 0.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Carlton Power
- Location
- Langage Solar Park, Lower Langage Farm, Plymouth, Devon, Devon, PL7 5AQ, United Kingdom
- Planning authority
- South Hams
- Planning application
- 1185/19/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 1185/19/FUL, with what the planning evidence pack adds for this site.
Every application in South Hams · Alerts for applications and incidents near here
Timeline
- 6 June 2019 Planning application submitted
- 4 October 2019 Planning permission granted
- 4 October 2022 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Langage Solar Park. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Langage Solar Park had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Langage Solar Park; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Langage Solar Park?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 April 2025.
- Where is Langage Solar Park?
- 3.8 km east of Plympton, Devon, United Kingdom (postcode PL7 5AQ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).