← Back to Hampshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Lakeside Business Park

Operator Custom Solar Limited · Owner Mitie Treasury Management Limited

Under Construction2 MWData checked 16 November 2026Source record dated 9 October 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Lakeside Business Park is a 2 MW battery storage site in Cosham, Hampshire, United Kingdom. Its planning application (22/00487/FUL) went to Portsmouth on 10 June 2022 and was granted on 1 November 2022. Construction started on 28 August 2023. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 65 other energy sites within 10 km, 17 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

CUSTOM SOLAR LTD (07886213), active, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Lakeside Business Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 114 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire114 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction126 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter169 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Custom Solar Limited
Owner
Mitie Treasury Management Limited
Location
Western Road, Portsmouth, Hampshire, PO6 3PQ, United Kingdom
Planning authority
Portsmouth
Planning application
22/00487/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/00487/FUL, with what the planning evidence pack adds for this site.

Every application in Portsmouth · Alerts for applications and incidents near here

  • 10 June 2022 Planning application submitted
  • 1 November 2022 Planning permission granted
  • 28 August 2023 Construction started

None found. The register holds no published incident that names Lakeside Business Park. If you know of one, report it (confidential reports are anonymised).

Has Lakeside Business Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lakeside Business Park; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Lakeside Business Park?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 9 October 2023.
Where is Lakeside Business Park?
In Cosham, Hampshire, United Kingdom (postcode PO6 3PQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).