Around this site

← Back to Ilocos Norte

Onshore wind · Philippines

Ilocos Norte CW Wind Power Project

Planned (permitted)120 MWChecked 8 October 2026Last changed in the dataset 8 May 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ilocos Norte CW Wind Power Project sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
120 MW
Status
Planned (permitted) (Pre-construction)
Owner
Citicore Wind Energy Corp [100%]
Location
Batac City, Ilocos Norte, Philippines
First operating
2033

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Ilocos Norte CW Wind Power Project. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.