← Back to Texas
Planning pack for this site, £295Other options

Battery storage · United States

Hornet Solar II (TX) (Hybrid)

Operator Vesper Energy Development LLC

Planned200 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hornet Solar II (TX) (Hybrid) is a 200 MW battery storage site 41 km north-west of Plainview, Swisher County, Texas, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There are 7 other energy sites within 10 km. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hornet Solar II (TX) (Hybrid) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 55 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-1652, Small fire contained at Terra-Gen battery storage in Valley Center, 556 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-16522026Small fire contained at Terra-Gen battery storage in Valley Center556 kmMinor
EIR-06792012Battery storage failure reported at solar integration site in Flagstaff, Arizona887 kmSignificant
EIR-28292022Lithium battery fire smoulders at Chandler storage facility, Arizona920 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 52 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage
Capacity
200 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
Vesper Energy Development LLC
Owner
Vesper Energy Development LLC
Location
Swisher County, Texas, United States
Expected
2028
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Hornet Solar II (TX) (Hybrid). If you know of one, report it (confidential reports are anonymised).

Has Hornet Solar II (TX) (Hybrid) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hornet Solar II (TX) (Hybrid); it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Hornet Solar II (TX) (Hybrid)?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Hornet Solar II (TX) (Hybrid)?
41 km north-west of Plainview, Swisher County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).