Battery storage · United Kingdom

Hillhead Of Gask, Longhaven -Battery Storage

Operator The Greenspan Agency · Owner Hgpv LTD

Under ConstructionData checked 16 November 2026Source record dated 19 February 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Hillhead Of Gask, Longhaven -Battery Storage is a battery storage site 6.4 km south-west of Peterhead, Aberdeenshire, United Kingdom. Its planning application (APP/2021/2467) went to Aberdeenshire on 14 January 2022 and was granted on 8 April 2022. Construction started on 11 November 2024. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 15 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

THE GREENSPAN AGENCY LIMITED (SC320833), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hillhead Of Gask, Longhaven -Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 457 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool457 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells485 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire639 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Under Construction
Operator or applicant
The Greenspan Agency
Owner
Hgpv LTD
Location
Hillhead Of Gask Longhaven Peterhead, Aberdeenshire, AB42 0PT, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2021/2467

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2021/2467, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 14 January 2022 Planning application submitted
  • 8 April 2022 Planning permission granted
  • 11 November 2024 Construction started

None found. The register holds no published incident that names Hillhead Of Gask, Longhaven -Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Hillhead Of Gask, Longhaven -Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hillhead Of Gask, Longhaven -Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Hillhead Of Gask, Longhaven -Battery Storage?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 February 2026.
Where is Hillhead Of Gask, Longhaven -Battery Storage?
6.4 km south-west of Peterhead, Aberdeenshire, United Kingdom (postcode AB42 0PT).