Battery storage · United Kingdom
Hillhead Of Gask, Longhaven -Battery Storage
Operator The Greenspan Agency · Owner Hgpv LTD
Under ConstructionData checked 16 November 2026Source record dated 19 February 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Hillhead Of Gask, Longhaven -Battery Storage is a battery storage site 6.4 km south-west of Peterhead, Aberdeenshire, United Kingdom. Its planning application (APP/2021/2467) went to Aberdeenshire on 14 January 2022 and was granted on 8 April 2022. Construction started on 11 November 2024. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 15 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Hillhead Of Gask, Longhaven -Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
THE GREENSPAN AGENCY LIMITED (SC320833), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hillhead Of Gask, Longhaven -Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 457 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 457 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 485 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 639 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-located with RE)
- Status
- Under Construction
- Operator or applicant
- The Greenspan Agency
- Owner
- Hgpv LTD
- Location
- Hillhead Of Gask Longhaven Peterhead, Aberdeenshire, AB42 0PT, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2021/2467
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2021/2467, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 14 January 2022 Planning application submitted
- 8 April 2022 Planning permission granted
- 11 November 2024 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Hillhead Of Gask, Longhaven -Battery Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Hillhead Of Gask, Longhaven -Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hillhead Of Gask, Longhaven -Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hillhead Of Gask, Longhaven -Battery Storage?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 February 2026.
- Where is Hillhead Of Gask, Longhaven -Battery Storage?
- 6.4 km south-west of Peterhead, Aberdeenshire, United Kingdom (postcode AB42 0PT).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).