Battery storage · United Kingdom
High Road, Saddlebow - Battery Storage
Operator Lynn Power Limited
Awaiting Construction50 MWData checked 16 November 2026Source record dated 16 August 2024
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
High Road, Saddlebow - Battery Storage is a 50 MW battery storage site 3.2 km south of King's Lynn, Norfolk, United Kingdom. Its planning application (22/01151/FM) went to King's Lynn and West Norfolk on 7 July 2022 and was granted on appeal on 29 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 18 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when High Road, Saddlebow - Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for High Road, Saddlebow - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 110 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 110 km | Significant |
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 138 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 193 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 50 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Appeal Granted)
- Operator or applicant
- Lynn Power Limited
- Location
- NW of High Road Saddlebow, Norfolk, PE34 3AW, United Kingdom
- Planning authority
- King's Lynn and West Norfolk
- Planning application
- 22/01151/FM
- Appeal reference
- 23/00032/REF
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/01151/FM, with what the planning evidence pack adds for this site.
Every application in King's Lynn and West Norfolk · Alerts for applications and incidents near here
Timeline
- 7 July 2022 Planning application submitted
- 25 April 2023 Planning permission refused
- 19 July 2023 Appeal lodged
- 29 July 2024 Planning permission granted
- 29 July 2024 Appeal granted
- 29 July 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names High Road, Saddlebow - Battery Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has High Road, Saddlebow - Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names High Road, Saddlebow - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of High Road, Saddlebow - Battery Storage?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 August 2024.
- Where is High Road, Saddlebow - Battery Storage?
- 3.2 km south of King's Lynn, Norfolk, United Kingdom (postcode PE34 3AW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).