Battery storage · United Kingdom

High Nunton Farm - Solar Farm & Battery Storage

Operator High Nunton Solar Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 26 June 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

High Nunton Farm - Solar Farm & Battery Storage is a battery storage site 41 km west of Maryport, Dumfries and Galloway, United Kingdom. Its planning application (21/2490/FUL) went to Dumfries and Galloway on 7 January 2022 and was granted on 22 January 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 7 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for High Nunton Farm - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 177 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool177 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells272 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire375 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
High Nunton Solar Limited
Location
The South & NW/O High Nunton Farm, Steading, Borgue, Castle Douglas, Dumfries and Galloway, DG6 4SH, United Kingdom
Planning authority
Dumfries and Galloway
Planning application
21/2490/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/2490/FUL, with what the planning evidence pack adds for this site.

Every application in Dumfries and Galloway · Alerts for applications and incidents near here

  • 7 January 2022 Planning application submitted
  • 22 January 2025 Planning permission granted
  • 22 January 2028 Planning permission runs out

None found. The register holds no published incident that names High Nunton Farm - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has High Nunton Farm - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names High Nunton Farm - Solar Farm & Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of High Nunton Farm - Solar Farm & Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 June 2026.
Where is High Nunton Farm - Solar Farm & Battery Storage?
41 km west of Maryport, Dumfries and Galloway, United Kingdom (postcode DG6 4SH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).