Around this site

← Back to Germany

Offshore wind · Germany

He Dreiht wind farm

Under construction960 MWChecked 8 October 2026Last changed in the dataset 9 January 2026

Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for He Dreiht wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Offshore wind
Capacity
960 MW
Status
Under construction (Construction)
Operator
EnBW Energie Baden-Württemberg
Owner
EnBW Energie Baden-Württemberg AG [100%]
Location
Borkum, Germany
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.