Around this site

← Back to Magallanes

Onshore wind · Chile

H2 Magallanes wind farm

Planned (announced)10000 MWChecked 8 October 2026Last changed in the dataset 30 January 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for H2 Magallanes wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
10000 MW
Status
Planned (announced) (Announced)
Operator
Total Eren
Owner
Total Eren SA [100%]
Location
San Gregorio, Magallanes, Chile
First operating
2030

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names H2 Magallanes wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.