Around this site

← Back to Rajasthan

Onshore wind · India

Green Infra SECI hybrid wind farm

Planned (permitted)225 MWChecked 8 October 2026Last changed in the dataset 21 January 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Green Infra SECI hybrid wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
225 MW
Status
Planned (permitted) (Pre-construction)
Operator
Sembcorp Industries
Owner
Sembcorp Industries Ltd
Location
Sura, Barmer, Rajasthan, India

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Green Infra SECI hybrid wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.