Gloucestershire Science And Technology Par - Energy Storage Facility

Operator Ecotricity Berkeley Storage Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 14 March 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Gloucestershire Science And Technology Par - Energy Storage Facility is a battery storage site 4.4 km south-east of Lydney, Gloucestershire, United Kingdom. Its planning application (S.22/0352/FUL) went to Stroud on 21 February 2022 and was granted on 5 October 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 12 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Gloucestershire Science And Technology Par - Energy Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 39 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire39 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter126 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells184 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Ecotricity Berkeley Storage Limited
Location
Berkeley Green UTC Gloucestershire Science And Technology Park Hamfield Lane Berkeley, Gloucestershire, GL13 9FB, United Kingdom
Planning authority
Stroud
Planning application
S.22/0352/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S.22/0352/FUL, with what the planning evidence pack adds for this site.

Every application in Stroud · Alerts for applications and incidents near here

  • 21 February 2022 Planning application submitted
  • 5 October 2022 Planning permission granted
  • 5 October 2025 Planning permission expired

None found. The register holds no published incident that names Gloucestershire Science And Technology Par - Energy Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Gloucestershire Science And Technology Par - Energy Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gloucestershire Science And Technology Par - Energy Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Gloucestershire Science And Technology Par - Energy Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 March 2022.
Where is Gloucestershire Science And Technology Par - Energy Storage Facility?
4.4 km south-east of Lydney, Gloucestershire, United Kingdom (postcode GL13 9FB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).